STRUCTURAL ENGINEERS
Other objects
 
Plunger, Żerań H&P Plant

Detaled fabrication drawings for boiler tubular element - plunger. Boiler steel.

 
WORKING BASKET

Working basket for lifting of collecting electrodes panels.

Frame for alignment of discharge electrodes. 

Detailed workshop design including structural analysis and fabrication drawings.

 
METRO STATION A-22 Wawrzyszew, Warsaw

 Steel formwork for concrete column with goblet end. Steel structure detailed fabrication drawings.

1 2
Our projects
Industrial
Experience. Precision. Excellence.
Retail
Designing the Future, Today.
Residential
From concept to creation
Road
Engineering That Works.
Other
Professional. Innovative. Reliable.
CELER Sp. z o.o. / Biuro Projektów Budownictwa / Kielce, ul. Klonowa 67 / ZP10, 25-553 Kielce
KRS 0000266187 / Sąd Rejonowy w Kielcach / Wydział X Krajowego Rejestru Sądowego / Wysokość kapitału zakładowego 50 000 PLN
Project and design PAWELEC.INFO