STRUCTURAL ENGINEERS
Industrial objects
 
Dalkia Poznań

Karolin Heat and Power Plant Poznan. Steel ducts detailed fabrication drawings for the main contractor Alstom Power Inc.

 
LA LORRAINE Polska

Production Hall of La Lorraine Bakery. Steel structure detailed design.

 
FLUID S.A.

BIOMASS ENERGY RECOVERY PLANT, Sedziszow.

Complete design of Biomass Hall with auxilliary facilities, Complete design of Warehouse Building.

Concrete and steel structure, from conceptual phase up to the execution detailed design. Coordination of branches.

1 2 3 4 5 6 7 8 9
Our projects
Industrial
Experience. Precision. Excellence.
Retail
Designing the Future, Today.
Residential
From concept to creation
Road
Engineering That Works.
Other
Professional. Innovative. Reliable.
CELER Sp. z o.o. / Biuro Projektów Budownictwa / Kielce, ul. Klonowa 67 / ZP10, 25-553 Kielce
KRS 0000266187 / Sąd Rejonowy w Kielcach / Wydział X Krajowego Rejestru Sądowego / Wysokość kapitału zakładowego 50 000 PLN
Project and design PAWELEC.INFO